Building Permits
To date, we have no information about building permits in 2024
Jun 28, 2016
Description: Install a radio box at the water treatment plant disconnect permit and cuts sheets mailed to fire department
- Fee: $120.00 paid to Town of Easton, Massachusetts
- Client: Easton Town Of
- Permit #: E-16-0411
Feb 22, 2016
Description: New wiring and connection of 2 new split system hvac systems including interconnection with the condenser and head. the connection of approx. 16 new condensate pumps in the existing split system heads. the disconnection of pwr to the 2 old split system condensers on roof
- Fee: $300.00 paid to Town of Easton, Massachusetts
- Client: Easton Town Of
- Permit #: E-16-0110
Jan 4, 2016
Description: Disconnect existing water booster heater. reconnect new 120v water booster w/ draft proving switch and disconnect
- Fee: $80.00 paid to Town of Easton, Massachusetts
- Client: Easton Town Of
- Permit #: E-16-0002
Dec 29, 2015
Description: Add 2 electric hand dryers
- Fee: $75.00 paid to Town of Easton, Massachusetts
- Client: Easton Town Of
- Permit #: E-15-0836
Aug 20, 2015
Description: Temp generator power for film production base camp
- Fee: $75.00 paid to Town of Easton, Massachusetts
- Client: Easton Town Of
- Permit #: E-15-0479
Jul 31, 2015
Description: Insulate pipe and ball valve with fiberglass and evergreen insulating products
- Contractor: Boston Energy Retrofit Llc
- Fee: $75.00 paid to Town of Easton, Massachusetts
- Client: Easton Town Of
- Parcel #: 26U-7
- Permit #: C-15-0672
Jul 31, 2015
Description: Replace 25 distribution transformers with high efficiency transformers
- Contractor: Complete Energy Solutions Inc
- Fee: $2,794.00 paid to Town of Easton, Massachusetts
- Client: Easton Town Of
- Permit #: E-15-0428
Jul 28, 2015
Description: New led kits and fixtures, exterior wallpacks, floods, canopy
- Contractor: Lighting Retrofit Services Inc
- Fee: $1,308.00 paid to Town of Easton, Massachusetts
- Client: Easton Town Of
- Permit #: E-15-0411
Jun 22, 2015
Description: Air barrier repair of windows and roof-wall intersection
- Contractor: Boston Energy Retrofit Llc
- Fee: $50.00 paid to Town of Easton, Massachusetts
- Client: Easton Town Of
- Parcel #: 21U-4
- Permit #: C-15-0482
Jun 22, 2015
Description: Installation of low voltage automation system
- Fee: $361.00 paid to Town of Easton, Massachusetts
- Client: Easton Town Of
- Permit #: E-15-0313
Apr 2, 2015
Description: Repair drywall due to water damage in rooms 122, 219, 220 it room hallway, tech room, 317, 318, 319, closet 3rd floor, hallway and all 3 custodial closets. (most patches are between 1' and 4' high
- Contractor: Todd A Texeira
- Fee: $800.00 paid to Town of Easton, Massachusetts
- Client: Easton Town Of
- Parcel #: 26U-7
- Permit #: C-15-0165
Sep 11, 2013
Description: Nr alt-construct bridge for walking/jogging path at oliver ames high school. (6 ft. wide by 22 ft. long) 132 sf. note: permit fee waived for easton public schools in-house project. bridge built prior to obtaining a building permit
- Client: Town Of Easton
- Parcel #: 26 U-7
- Permit #: 13904
Aug 29, 2013
Description: Nr alt-construction of a soccer kick-masonry/concrete block with concrete foundation/ footing 48" below grade #6 rebar (steel reinforcing) 24" o.c. building permit fee waived for easton public schools
- Client: Town Of Easton
- Parcel #: 26 U-7
- Permit #: 13884
Jun 15, 2010
Description: Existing high school-repair/replace-laminated glass in window which had opening for camera at gym and a.d. office-no openings permitted-note: final inspection is required. fee waived for municipal building
- Client: Town Of Easton
- Parcel #: 26U-7
- Permit #: 12576
Oct 4, 2006
Description: Additions and renovations of existing high school-additions: 146,000sf; alterations: 128,000sf; construction control-phased construction-fire protection-903 narrative-fully sprinklered-fire alarm-all elements of building & site to comply with 521 cmr; aab regulations-02/04/05-amd-change of applicant-amend-10/4/06-completion contractor taking over-adds & reno of exstg high school-add: 146,000sf; alt: 128,000 sf-permit fee $137,900 (waived by board of selectmen)
- Client: Town Of Easton
- Parcel #: 26U-6, 7
- Permit #: 10365
Description: Plumbing to install a booster on hot water heater
- Contractor: Manny's Plumbing And Heating Inc
- Client: Easton Town Of
- Permit #: 100 LOTHROP STREET
100 Lothrop St Fire Incident History
To date, we have no information about fire incidents in 2024
21 Sep 2019
Fire, other
Property Use —
High school/junior high school/middle school
Area of Origin —
Outside area, other
First Ignition —
Box, carton, bag, basket, barrel
Heat Source —
Hot ember or ash
17 Dec 2004
Cooking fire, confined to container
Property Use —
High school/junior high school/middle school
Area of Origin —
Other
First Ignition —
Appliance housing or casing
Heat Source —
Heat from powered equipment, other
Lothrop St Fire Incident History
To date, we have no information about fire incidents in 2024
21 Sep 2019
Fire, other
Property Use —
High school/junior high school/middle school
Area of Origin —
Outside area, other
First Ignition —
Box, carton, bag, basket, barrel
Heat Source —
Hot ember or ash
19 Jan 2006
Special outside fire, other
Property Use —
Playground
Area of Origin —
Outside area, other
First Ignition —
Adornment, recreational material, signs, other
17 Dec 2004
Cooking fire, confined to container
Property Use —
High school/junior high school/middle school
Area of Origin —
Other
First Ignition —
Appliance housing or casing
Heat Source —
Heat from powered equipment, other
100 Lothrop St incidents registered in FEMA
(Federal Emergency Management Agency)
To date, we have no information about incidents registered in FEMA in 2024
12 Nov 2015
Electrical wiring/equipment problem, other
Property Use —
High school/junior high school/middle school
07 Dec 2004
Gas leak (natural gas or LPG)
Property Use —
High school/junior high school/middle school
Lothrop St Incidents registered in FEMA
(Federal Emergency Management Agency)
To date, we have no information about incidents registered in FEMA in 2024
12 Nov 2015
Electrical wiring/equipment problem, other
Property Use —
High school/junior high school/middle school
22 Sep 2015
Heat from short circuit (wiring), defective/worn
Property Use —
1 or 2 family dwelling
18 Mar 2015
Gas leak (natural gas or LPG)
Property Use —
1 or 2 family dwelling
24 Mar 2011
Building fires
Property Use —
Warehouse
Properties Nearby
Street Address | Residens/Landlords | |
---|---|---|
1 Lothrop St, Easton, MA 02356-1841 High Rise |
C Anderson, Dianne Arroyo | |
6 Lothrop St, Easton, MA 02356-1804 Single Family
|
Eloise R Lyons, Christina Remick | |
7A Lothrop St, Easton, MA Single Family
|
Ruth A Calvagne | |
7 Lothrop St, Easton, MA 02356-1803 Single Family
|
R Calvagne, Ruth M Calvagne | |
8 Lothrop St, Easton, MA 02356-1804 Townhouse
|
Alan W Hopkins, Ralph A Hopkins | |
9 Lothrop St, Easton, MA 02356-1803 Single Family
|
Gregory P Hannon, Kristy L Hannon | |
46 Lothrop St, Easton, MA 02356-2029
|
HELP US GET SAFE (H.U.G.S.), II, INC, H.U.G.S. II | |
48 Lothrop St, Easton, MA 02356-2030
|
Easton Ambulance, Fire Dept |