Building Permits
To date, we have no information about building permits in 2025
Jun 2, 2016
Description: Scope of work to include: all work on the first floor 1.) expanding (e) data center with (n) partitions and doors 2.) install two new liebert cooling units, reducting 3.) installing a (n) diesel tank (remove 1,000gal tank/replace with 5,000 gal tank)
- Valuation: $44,663,700
- Parcel #: 24422020
- Permit #: 2015 104976 CI
Jun 2, 2016
Description: Scope of work to include: all work on the first floor 1.) expanding (e) data center with (n) partitions and doors 2.) install two new liebert cooling units, reducting 3.) installing a (n) diesel tank (remove 1,000gal tank/replace with 5,000 gal tank)
- Valuation: $44,663,700
- Parcel #: 24422020
- Permit #: 2016 116657 CI
Feb 11, 2016
Description: Scope of work to include: installation of ups system with 106.4 gallons of electrolyte
- Valuation: $5,548,600
- Parcel #: 24422020
- Permit #: 2015 105724 CI
Feb 11, 2016
Description: Scope of work to include: installation of ups system with 106.4 gallons of electrolyte
- Valuation: $5,548,600
- Parcel #: 24422020
- Permit #: 2016 105227 CI
Sep 2, 2014
Description: Install a repeater and donner antenna 1x2x2 sqft no calcs.
- Contractor: Nsa Wireless Inc
- Valuation: $820,000
- Parcel #: 70832006
- Permit #: 2014 031449 CI
Jun 12, 2014
Description: 14-004343
- Contractor: Transbay Fire Protection Inc
- Permit #: 2014 021251 FE
May 9, 2014
Description: The installation of one dx type computer room air conditioner, 2 power distribution units, 2 uninterruptible power supplies, a 300 kw diesel motor generator set, and associated transfer switches and distribution panel in the server lab.
- Valuation: $80,319,900
- Parcel #: 70832006
- Permit #: 2014 016758 CI
Apr 9, 2014
Description: 106 gal total battery electrolite for two ups systems
- Permit #: 2014 012507 HZ
Apr 9, 2014
Description: New diesel generator 440 gal ul142 outdoor tank
- Permit #: 2014 012506 HZ
Mar 14, 2014
Description: Voluntary
- Contractor: Transbay Fire Protection Inc
- Permit #: 2014 009476 FE
Mar 10, 2014
Description: Scope of work: interior tenant improvement in an (e) multi-tower business campus. the towers are connected and enclosed on the first level and the second level is a podium -style construction. cores: demo includes removal of select walls, ceilings, lighting, power, a/v; upgrade (e) fire resistive rating for (e) exit stairs. office wings: demo includes removal of office doors and frames, ceiling tiles (ceiling grid to remain in place), walls enclosing (e) three offices at the ends of wings, wall mounted terminal boxes. new construction includes installation of drop ceilings below (e) ceiling grid; ceiling tile replacement; lighting ballast replacement; new paint, carpet, data and electrical outlets. front lobby desk: (e)lobby desk millwork will remain in-place with modifications to (e) counter.
- Contractor: Gensler
- Valuation: $1,900,000,000
- Parcel #: 70832006
- Permit #: 2013 128540 CI
Jan 29, 2014
Description: The installation of one dx type computer room air conditioner, 2 power distribution units, 2 uninterruptible power supplies, a 300 kw diesel motor generator set, and associated transfer switches and distribution panel in the server lab.
- Valuation: $80,319,900
- Parcel #: 70832006
- Permit #: 2014 004343 CI
Jan 16, 2014
Description: Scope of work: installation of two (2) 200kva power distribution units connect pdu's to (n) substation installation includes seismic anchorage and electrical power
- Valuation: $6,301,300
- Parcel #: 70832006
- Permit #: 2014 002265 CI
Jan 13, 2014
Description: Scope of work: installation of two (2) 200kva power distribution units connect pdu's to (n) substation installation includes seismic anchorage and electrical power
- Valuation: $6,301,300
- Parcel #: 70832006
- Permit #: 2014 001431 CI
Nov 27, 2013
Description: 13-109890
- Contractor: Transbay Fire Protection Inc
- Permit #: 2013 131628 FE
Oct 22, 2013
Description: Scope of work: installation of cooling units (air conditioners) in a lab. this includes piping, electrical, and seismic anchoring/bracking work.
- Valuation: $33,200,000
- Parcel #: 70832006
- Permit #: 2013 126293 CI
Oct 15, 2013
Description: Scope of work: installation of cooling units (crac units) in a server room. this includes piping, electrical, and seismic anchoring/bracking work.
- Valuation: $33,200,000
- Parcel #: 70832006
- Permit #: 2013 126243 CI
Sep 18, 2013
Description: 13-114175
- Contractor: Transbay Fire Protection Inc
- Permit #: 2013 123028 FE
Aug 5, 2013
Description: Scope of work: replace (e) chiller #2. includes electrical power, mechanical hvac, pipe support and seismic bracing.
- Valuation: $150,431,300
- Parcel #: 70832006
- Permit #: 2013 117164 CI
Jul 16, 2013
Description: Scope of work: construct a prototype of a typical office area for user testing and feedback. the prototype scope is limited to approximately 1,300 square feet on the 4th floor of tower g, consisting primarily of finish and furniture upgrades. demo 3 offices to accommodate a team area. the remaining 6 offices in the scope area will be refinished. replace ceiling tile. in the new open team area, a small area of suspended ceiling will be installed below the existing grid. the existing doors will be replaced with new doors with accessible hardware. a few new electrical outlets will be installed. existing lighting, hvac and sprinkler systems will remain, except for new lighting and diffusers provided at the team area. sprinkler heads will be relocated in the new ceiling of the open team area and will be submitted as a deferred submittal.
- Valuation: $10,984,800
- Parcel #: 70832006
- Permit #: 2013 114754 CI
Jul 16, 2013
Description: Scope of work: construct a prototype of a typical office area for user testing and feedback. the prototype scope is limited to approximately 1,300 square feet on the 4th floor of tower g, consisting primarily of finish and furniture upgrades. demo 3 offices to accommodate a team area. the remaining 6 offices in the scope area will be refinished. replace ceiling tile. in the new open team area, a small area of suspended ceiling will be installed below the existing grid. the existing doors will be replaced with new doors with accessible hardware. a few new electrical outlets will be installed. existing lighting, hvac and sprinkler systems will remain, except for new lighting and diffusers provided at the team area. sprinkler heads will be relocated in the new ceiling of the open team area and will be submitted as a deferred submittal.
- Valuation: $10,984,800
- Parcel #: 70832006
- Permit #: 2013 114175 CI
Jun 24, 2013
Description: Scope of work: phase 2 - pdu installation includes electrical power and seismic anchorage.
- Parcel #: 70832006
- Permit #: 2013 111111 CI
Jun 24, 2013
Description: Scope of work: phase 1 - ibm substation 12 and 13 replacement replacing 2 sets of interior doors and enlarge 1 interior leaf door to double leaf door.
- Valuation: $134,349,200
- Parcel #: 70832006
- Permit #: 2013 110528 CI
Jun 19, 2013
Description: Scope of work: replace (e) chiller #2. includes electrical power, mechanical hvac, pipe support and seismic bracing.
- Valuation: $150,431,300
- Parcel #: 70832006
- Permit #: 2013 110406 CI
Jun 11, 2013
Description: Scope of work: phase 2 - pdu installation includes electrical power and seismic anchorage.
- Parcel #: 70832006
- Permit #: 2013 110530 CI
Jun 11, 2013
Description: Scope of work: ibm substation 12 and 13 replacement replacing 2 sets of interior doors and enlarge 1 interior leaf door to double leaf door.
- Valuation: $134,349,200
- Parcel #: 70832006
- Permit #: 2013 109890 CI
Mar 25, 2013
Description: Scope of work: the scope of work includes installation of a new computer room air conditioner (crac). this includes mechanical piping and electrical work.
- Valuation: $6,247,500
- Parcel #: 70832006
- Permit #: 2013 101342 CI
Mar 25, 2013
Description: Scope of work: the scope of work includes installation of a new computer room air conditioner (crac). this includes mechanical piping and electrical work.
- Valuation: $6,247,500
- Parcel #: 70832006
- Permit #: 2013 100662 CI
Oct 3, 2012
Description: Scope of work: installation of a new 1,420 lbs air conditioner (chiller unit) within the raised floor data center.
- Valuation: $5,828,700
- Parcel #: 70832006
- Permit #: 2012 029153 CI
Oct 2, 2012
Description: Scope of work: installation of a new 1,420 lbs air conditioner (chiller unit) within the raised floor data center.
- Valuation: $5,828,700
- Parcel #: 70832006
- Permit #: 2012 027535 CI
Apr 25, 2012
Description: Scope of work to include: install a 200 kva pdu in server room section 28.
- Valuation: $5,757,600
- Parcel #: 70832006
- Permit #: 2012 010418 CI
Mar 27, 2012
Description: Scope of work to include: install a 200 kva pdu in server room.
- Valuation: $5,757,600
- Parcel #: 70832006
- Permit #: 2012 008560 CI
Jan 9, 2012
Description: Roof top cell site upgrade: mounting two antenas and one small cabinet on exsiting roof top walls, electrical permit is also required.
- Valuation: $4,850,000
- Parcel #: 70832006
- Permit #: 2012 001711 CI
Nov 30, 2011
Description: Roof top cell site upgrade: mounting two antenas and one small cabinet on exsiting roof top walls, electrical permit is also required.
- Valuation: $4,850,000
- Parcel #: 70832006
- Permit #: 2011 037646 CI
Apr 5, 2011
Description: Installation of a computer room air conditioner & power distribution unit
- Valuation: $9,127,500
- Parcel #: 70832006
- Permit #: 2011 011962 CI
Apr 4, 2011
Description: Installation of a computer room air conditioner & power distribution unit
- Valuation: $9,127,500
- Parcel #: 70832006
- Permit #: 2011 011943 CI
Nov 30, 2010
Description: Install 3 lightning protection masts around ibm's 115kv substation.
- Valuation: $10,813,800
- Parcel #: 70832006
- Permit #: 2010 030527 CI
Nov 29, 2010
Description: Install 3 lightning protection masts around ibm's 115kv substation.
- Valuation: $10,813,800
- Parcel #: 70832006
- Permit #: 2010 029992 CI
Sep 20, 2010
Description: New utility trench. install piping for chilled and hot water
- Valuation: $98,408,200
- Parcel #: 70832006
- Permit #: 2010 024476 CI
Aug 4, 2010
Description: Lightning protection for 115 kv switchyard at 3 locations per plan
- Permit #: 2010 020338 GC
Jun 9, 2010
Description: 1) install a new liebert unit in existing raised floor lab. 2) modify existing raised floor as required for new liebert installation 3) install new pdu unit and panel in existing raised floor lab 4) modify existing raised floor as required for new pdu installation
- Valuation: $10,431,000
- Parcel #: 70832006
- Permit #: 2010 015537 CI
Jun 7, 2010
Description: 1) install a new liebert unit in existing raised floor lab. 2) modify existing raised floor as required for new liebert installation 3) install new pdu unit and panel in existing raised floor lab 4) modify existing raised floor as required for new pdu installation
- Valuation: $10,431,000
- Parcel #: 70832006
- Permit #: 2010 012366 CI
May 17, 2010
Description: New utility trench. install piping for chilled and hot water
- Valuation: $98,408,200
- Parcel #: 70832006
- Permit #: 2010 009384 CI
May 10, 2010
Description: Planned development permit to erect three 100 foot lightning masts at an existing research and development facility on a 1,180 gross acre site in the ip(pd) planned development zoning district
- Permit #: 2010 011730 DV
Bailey Ave Fire Incident History
To date, we have no information about fire incidents in 2025
09 Aug 2016
Cooking fire, confined to container
Property Use —
1 or 2 family dwelling
Area of Origin —
Cooking area, kitchen
First Ignition —
Organic materials, other
Heat Source —
Heat from other open flame or smoking materials
Bailey Ave Incidents registered in FEMA
(Federal Emergency Management Agency)
To date, we have no information about incidents registered in FEMA in 2025
01 Feb 2015
Authorized controlled burning
Property Use —
Open land or field
Properties Nearby
Street Address | Residens/Landlords | |
---|---|---|
Jenny C Cisneros | ||